top of page
Forum Posts
johnhughes
Feb 22, 2021
In S-21 TECH QUESTIONS
Has anyone modified the Aft Spar Attach Doubler to mimic the new one that is now with the kits? I have one of the early kits and noticed that the Aft Spar Attach doubler has several more holes in it than the original. I did talk to Randy and he thought they had published a drawing to allow those of us that were early to modify ours to mimic the new design ie drill more holes. I have not been able to find their drawing or any other information related to this topic, thus my posting. I have sent followup Emails etc to RANs and I have not received any reply, so I am reaching out to my fellow builders for information, or maybe someone else in the RANs office can help me. Thanks in advance for your help.
0
1
123
johnhughes
Apr 11, 2020
In S-21 TECH QUESTIONS
When i have positioned one of my hinges (i only checked one), on the Trim tab for predrilling, i noticed the the location of the new holes on the hinge will be within about 1 hole diameter from the edge of the hinge. Is this correct? If not, what are my options, the location of the holes in the FWD Spar of the trim tab dictate the location of the holes to be pre-drilled in the hinge. Thoughts, solutions?
0
6
148
johnhughes
Apr 11, 2020
In S-21 TECH QUESTIONS
Hi all, My Elevator Forward Spar is missing the pre-drilled holes on the Left Side. Has anyone else experienced this and if so, what it the solution to drilling the new holes in the correct position?
0
2
100
johnhughes
More actions
bottom of page